Overview of Initial Portfolio Assets
Pursuant to our successful IPO in April-May 2021, our Initial Portfolio Assets comprise five power transmission projects acquired from our Sponsor, POWERGRID. The assets include grid strengthening links, generation-linked assets, and assets linked with inter-regional power flow. Spread across five demand and supply-centric States, they have been consistently operating above the target availability and with high safety standards. We are focused to maintain and optimise their performance.
Jabalpur
NTPC Gadarwara STPS
Wardha Parli (PG)
Solapur
Parli (New)
SNAPSHOT OF OUR ASSETS
PJTL
Vindhyachal
SPV
Location
Line Length (cKm) Transformation capacity (MVA)
Remaining TSA Life (years) Gross Block (` million)
FY 2021-22 Revenues*
(` million)
% contribution to
FY 2021-22 revenues* Shareholding acquired Lock-in expiry (for balance 26% shareholding)
POWERGRID Vizag Transmission Limited (PVTL)
Andhra Pradesh and Telangana 956.84 -
29.8 13,097.7 2,942.98
21.5%
100%** Completed
POWERGRID Kala Amb Transmission Limited (PKATL)
Himachal Pradesh
2.47 630
30.3 3,293.9 707.34
5.2% 74%
PVTL
Vemagiri
Khammam
Nagarjuna Sagar
Note: Map not to scale
POWERGRID Parli Transmission Limited (PPTL)
Maharashtra
966.12 3,000
31.2 19,282.6 3,361.69
24.5% 74%
June 2023
POWERGRID Warora Transmission Limited (PWTL)
Madhya Pradesh and Maharashtra 1,028.11 3,000
31.3 23,472.8 3,756.47
27.4% 74%
July 2023
765/400 kV Substation
400/220 kV Substation 765 kV DC line
400 kV DC line
POWERGRID Jabalpur Transmission Limited (PJTL)
Madhya Pradesh
745.05 -
31.8 16,407.6 2,937.60
21.4% 74%
January 2024
Kala Amb Abdullapur
PKATL
*For the period April 1, 2021 to March 31, 2022 **74% acquired during IPO and 26% in March 2022
PPTL
Warora Srikakulam
July 2022
Karcham Wangtoo